PROJECT SCOPE: The City project includes reconstruction of 3 sections of Country Club Drive.

Location 1: Country Club Drive, near FM-740, south lanes.
Location 2: Country Club Drive, 600 block area, near Country Club.
Location 3: Country Club Drive, 900 block area, near tennis center.

The construction is scheduled to begin at location 1 on Wednesday, April 15, 2015 (weather permitting). Once location 1 is significantly complete, the contractor will move to location 2, etc.

  • Construction is allowed between 7:00 am to 8:00 pm, Monday through Friday.
  • The roadway will typically be constructed one-half at a time and will be reduced to one lane during construction.
  • Access to homes will be maintained during construction. Driveways within the pavement repair area may not be accessible when the driveway approaches are being re-constructed. The contractor will notify the homeowner in advance.
  • The contractor’s estimated completion time is 14 calendar days per location.

The contractor is Estrada Concrete Company, 469-279-3464.